Blue line to Nacka, Södermalm and Söderort

Söder, linjekarta
The extension of the Metro to Nacka, Södermalm and Söderort covers a distance of 11 kilometres and will be constructed entirely below ground.

This part of the Metro extension consists of three projects: 

Nacka
includes the Sickla - Järla - Nacka extension. 


Södermalm
includes the Kungsträdgården - Sofia - Hammarby kanal extension.

Söderort
includes the Gullmarsplan - Slakthusområdet - Sockenplan extension. 

Kungsträdgården
The extension of the Metro begins at Kungsträdgården, where the tunnel is already prepared for a future extension. From there a new tunnel will be constructed through the rock below water level, the first station being Sofia on Södermalm. South of Sofia station, the tunnel spits in two directions.

Sofia - Sockenplan
The second section runs from Sofia station to Gullmarsplan, where a new platform is being built below the existing one. The Metro then continues southwards with new station Slakthusområdet that will replace the present stations at Globen and Enskede gård. North of station Sockenplan, the new line connects with the existing Hagsätra branch line, incorporating it into the Blue Line. 

Facts about the Blue line to Nacka, Södermalm and Söderort:

  • The Metro will be extended by 11.3 kilometres.

  • All track tunnels will be constructed in rock.

  • 2 180 000 cubic metres of solid rock will be blasted away.

  • 57 000 cubic metres of concrete will be used. 

  • Planned construction start 2020.

  • Planned trafic start 2030.