{"name":"Nya tunnelbanan","description":"","url":"https:\/\/nyatunnelbanan.se","home":"https:\/\/nyatunnelbanan.se\/en\/","gmt_offset":1,"timezone_string":"Europe\/Stockholm","page_for_posts":0,"page_on_front":468,"show_on_front":"page","namespaces":["oembed\/1.0","wpml\/v1","akismet\/v1","redirection\/v1","rankmath\/v1","rankmath\/v1\/setupWizard","rankmath\/v1\/an","wordfence-login-security\/v1","wordfence\/v1","wpml\/st\/v1","wpml\/tm\/v1","wpml\/ate\/v1","mediaflow","pods\/v1","rankmath\/v1\/ai-visibility","rankmath\/v1\/ca","rankmath\/v1\/in","rankmath\/v1\/status","eap-accordion\/v2","otgs\/installer\/v1","rankmath-marketplace\/v1","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1","wp-abilities\/v1"],"authentication":[],"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/batch\/v1"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"default":"json","required":false},"maxwidth":{"default":600,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/oembed\/1.0\/embed"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"description":"The oEmbed format to use.","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"The maximum width of the embed frame in pixels.","type":"integer","default":600,"required":false},"maxheight":{"description":"The maximum height of the embed frame in pixels.","type":"integer","required":false},"discover":{"description":"Whether to perform an oEmbed discovery request for unsanctioned providers.","type":"boolean","default":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/oembed\/1.0\/proxy"}]}},"\/wpml\/v1":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1"}]}},"\/wpml\/v1\/ate\/connection":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/ate\/connection"}]}},"\/wpml\/v1\/ate\/connection\/probe":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/ate\/connection\/probe"}]}},"\/wpml\/v1\/ate\/connection\/hide-support":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/ate\/connection\/hide-support"}]}},"\/wpml\/v1\/dashboard\/taxonomies":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"since":{"type":"string","required":false},"search":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/dashboard\/taxonomies"}]}},"\/wpml\/v1\/dashboard\/taxonomies\/rescan-labels":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"taxonomy":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/dashboard\/taxonomies\/rescan-labels"}]}},"\/wpml\/v1\/dashboard\/taxonomies\/translate":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"selectedTaxonomies":{"type":"array","required":true},"selectedLabels":{"type":"array","default":[],"required":false},"languageCodes":{"type":"array","required":false},"alreadyTranslated":{"type":"string","default":"leave","required":false},"whenFinished":{"type":"string","default":"publish","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/dashboard\/taxonomies\/translate"}]}},"\/wpml\/v1\/custom-xml-config":{"namespace":"wpml\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"content":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/custom-xml-config"}]}},"\/wpml\/v1\/custom-xml-config\/validate":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"content":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/custom-xml-config\/validate"}]}},"\/akismet\/v1":{"namespace":"akismet\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"akismet\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/akismet\/v1"}]}},"\/akismet\/v1\/key":{"namespace":"akismet\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"key":{"type":"string","description":"A 12-character Akismet API key. Available at akismet.com\/account","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/akismet\/v1\/key"}]}},"\/akismet\/v1\/settings":{"namespace":"akismet\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"akismet_strictness":{"type":"boolean","description":"If true, Akismet will automatically discard the worst spam automatically rather than putting it in the spam folder.","required":false},"akismet_show_user_comments_approved":{"type":"boolean","description":"If true, show the number of approved comments beside each comment author in the comments list page.","required":false},"akismet_enable_mcp_access":{"type":"boolean","description":"If true, allow MCP clients to access Akismet data and functionality.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/akismet\/v1\/settings"}]}},"\/akismet\/v1\/stats":{"namespace":"akismet\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"interval":{"type":"string","description":"The time period for which to retrieve stats. Options: 60-days, 6-months, all","default":"all","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/akismet\/v1\/stats"}]}},"\/akismet\/v1\/stats\/(?P<interval>[\\w+])":{"namespace":"akismet\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"interval":{"description":"The time period for which to retrieve stats. Options: 60-days, 6-months, all","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/akismet\/v1\/alert":{"namespace":"akismet\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"key":{"type":"string","description":"A 12-character Akismet API key. Available at akismet.com\/account","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"key":{"type":"string","description":"A 12-character Akismet API key. Available at akismet.com\/account","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"key":{"type":"string","description":"A 12-character Akismet API key. Available at akismet.com\/account","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/akismet\/v1\/alert"}]}},"\/akismet\/v1\/webhook":{"namespace":"akismet\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/akismet\/v1\/webhook"}]}},"\/redirection\/v1":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"redirection\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1"}]}},"\/redirection\/v1\/redirect":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/redirect"}]}},"\/redirection\/v1\/redirect\/(?P<id>[\\d]+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/redirect\/post":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"text":{"description":"Text to match","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/redirect\/post"}]}},"\/redirection\/v1\/bulk\/redirect\/(?P<bulk>delete|enable|disable|reset)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"global":{"description":"Apply bulk action globally, as per filters","type":"boolean","required":false},"items":{"description":"Array of IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/group":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"moduleId":{"description":"Module ID","type":"integer","minimum":0,"maximum":3,"required":true},"name":{"description":"Group name","type":"string","required":true},"status":{"description":"Status of the group","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/group"}]}},"\/redirection\/v1\/group\/dropdown":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/group\/dropdown"}]}},"\/redirection\/v1\/group\/(?P<id>[\\d]+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"moduleId":{"description":"Module ID","type":"integer","minimum":0,"maximum":3,"required":true},"name":{"description":"Group name","type":"string","required":true},"status":{"description":"Status of the group","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/bulk\/group\/(?P<bulk>delete|enable|disable)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/log":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/log"}]}},"\/redirection\/v1\/bulk\/log\/(?P<bulk>delete)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/404":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/404"}]}},"\/redirection\/v1\/bulk\/404\/(?P<bulk>delete)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/setting":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/setting"}]}},"\/redirection\/v1\/plugin":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"name":{"description":"Name","type":"string","required":false},"value":{"description":"Value","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/plugin"}]}},"\/redirection\/v1\/plugin\/delete":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/plugin\/delete"}]}},"\/redirection\/v1\/plugin\/test":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/plugin\/test"}]}},"\/redirection\/v1\/plugin\/data":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"upgrade":{"description":"Upgrade parameter","type":"string","enum":["stop","skip","retry"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/plugin\/data"}]}},"\/redirection\/v1\/plugin\/finish":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/plugin\/finish"}]}},"\/redirection\/v1\/plugin\/fix":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"reason":{"description":"Reason for fix","type":"string","required":true},"current":{"description":"Current version","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/plugin\/fix"}]}},"\/redirection\/v1\/import\/file\/(?P<group_id>\\d+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"dry_run":{"required":false},"duplicate_mode":{"required":false},"deduplicate":{"required":false},"import_sections":{"required":false},"format":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/import\/plugin":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"delete_source":{"required":false},"duplicate_mode":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/import\/plugin"}]}},"\/redirection\/v1\/import\/plugin\/(?P<plugin>[a-z0-9-]+)\/preview":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"delete_source":{"required":false},"duplicate_mode":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/export\/(?P<module>1|2|3|all)\/(?P<format>csv|apache|nginx|json|redirects-file)":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/export\/redirect\/preview":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/export\/redirect\/preview"}]}},"\/redirection\/v1\/export\/redirect":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/export\/redirect"}]}},"\/redirection\/v1\/export\/log\/preview":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/export\/log\/preview"}]}},"\/redirection\/v1\/export\/group\/(?P<format>csv|json)":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/export\/log\/(?P<format>csv|json)":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/export\/404\/preview":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/export\/404\/preview"}]}},"\/redirection\/v1\/export\/404\/(?P<format>csv|json)":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/redirection\/v1\/export\/bundle":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/export\/bundle"}]}},"\/redirection\/v1\/export\/bundle\/preview":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/redirection\/v1\/export\/bundle\/preview"}]}},"\/rankmath\/v1":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1"}]}},"\/rankmath\/v1\/saveModule":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"module":{"type":"string","description":"Module slug","required":true},"state":{"type":"string","description":"Module state either on or off","enum":["on","off"],"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/saveModule"}]}},"\/rankmath\/v1\/toolsAction":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"action":{"type":"string","description":"Action to perform","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/toolsAction"}]}},"\/rankmath\/v1\/updateMode":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"mode":{"type":"string","description":"Mode to set","enum":["easy","advanced","custom"],"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/updateMode"}]}},"\/rankmath\/v1\/dashboardWidget":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/dashboardWidget"}]}},"\/rankmath\/v1\/updateSeoScore":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"postScores":{"type":"object","description":"Post scores","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/updateSeoScore"}]}},"\/rankmath\/v1\/updateSettings":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/updateSettings"}]}},"\/rankmath\/v1\/searchPage":{"namespace":"rankmath\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/searchPage"}]}},"\/rankmath\/v1\/disconnectSite":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"token":{"type":"string","description":"Site token","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/disconnectSite"}]}},"\/rankmath\/v1\/getFeaturedImageId":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"postId":{"type":"integer","description":"Post ID","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/getFeaturedImageId"}]}},"\/rankmath\/v1\/updateRedirection":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"objectID":{"type":"integer","description":"Object unique id","required":true},"objectType":{"type":"string","default":"post","description":"Object Type i.e. post, term, user","required":true},"hasRedirect":{"type":"boolean","description":"Whether the object has a redirect or not","required":true},"redirectionID":{"type":"string","description":"Redirection ID","required":false},"redirectionUrl":{"type":"string","description":"Redirection URL","required":false},"redirectionType":{"type":"string","default":"301","description":"Redirection Type","enum":["301","302","307","410","451"],"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/updateRedirection"}]}},"\/rankmath\/v1\/updateMeta":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"objectType":{"type":"string","description":"Object Type i.e. post, term, user","required":true},"objectID":{"type":"integer","description":"Object unique id","required":true},"meta":{"description":"Meta to add or update data.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/updateMeta"}]}},"\/rankmath\/v1\/updateSchemas":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"objectType":{"type":"string","description":"Object Type i.e. post, term, user","required":true},"objectID":{"type":"integer","description":"Object unique id","required":true},"schemas":{"description":"schemas to add or update data.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/updateSchemas"}]}},"\/rankmath\/v1\/updateMetaBulk":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"rows":{"description":"Selected posts to update the data for.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/updateMetaBulk"}]}},"\/rankmath\/v1\/setupWizard":{"namespace":"rankmath\/v1\/setupWizard","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/setupWizard","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/setupWizard"}]}},"\/rankmath\/v1\/setupWizard\/getStepData":{"namespace":"rankmath\/v1\/setupWizard","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"step":{"type":"string","description":"Current Step","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/setupWizard\/getStepData"}]}},"\/rankmath\/v1\/setupWizard\/updateStepData":{"namespace":"rankmath\/v1\/setupWizard","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"step":{"type":"string","description":"Current Step","required":true},"value":{"type":"object","description":"Current Step Data","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/setupWizard\/updateStepData"}]}},"\/rankmath\/v1\/setupWizard\/updateTrackingOptin":{"namespace":"rankmath\/v1\/setupWizard","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"enable_tracking":{"type":"string","description":"Enable Tracking","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/setupWizard\/updateTrackingOptin"}]}},"\/rankmath\/v1\/saveTemplate":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"postId":{"type":"integer","description":"Post ID.","required":false},"schema":{"type":"object","description":"Schema data.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/saveTemplate"}]}},"\/rankmath\/v1\/getVideoData":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"objectID":{"type":"integer","description":"Object unique id","required":true},"url":{"description":"Video URL.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/getVideoData"}]}},"\/rankmath\/v1\/an":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/an","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an"}]}},"\/rankmath\/v1\/an\/getKeywordPages":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"query":{"description":"Query to search.","type":"string","default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/getKeywordPages"}]}},"\/rankmath\/v1\/an\/postsOverview":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/postsOverview"}]}},"\/rankmath\/v1\/an\/getTrackedKeywords":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/getTrackedKeywords"}]}},"\/rankmath\/v1\/an\/getTrackedKeywordsRows":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Keyword to search.","type":"string","default":"","required":false},"orderby":{"default":"default","enum":["default","keyword"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/getTrackedKeywordsRows"}]}},"\/rankmath\/v1\/an\/getTrackedKeywordSummary":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/getTrackedKeywordSummary"}]}},"\/rankmath\/v1\/an\/trackedKeywordsOverview":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/trackedKeywordsOverview"}]}},"\/rankmath\/v1\/an\/addTrackKeyword":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"keyword":{"description":"Keyword to add.","type":"string","default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/addTrackKeyword"}]}},"\/rankmath\/v1\/an\/autoAddFocusKeywords":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"data":{"description":"Data to add.","type":"object","default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/autoAddFocusKeywords"}]}},"\/rankmath\/v1\/an\/removeTrackKeyword":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc","ASC","DESC"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/removeTrackKeyword"}]}},"\/rankmath\/v1\/an\/deleteTrackedKeywords":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/deleteTrackedKeywords"}]}},"\/rankmath\/v1\/an\/getDesktopPagespeed":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"id":{"description":"Record id.","type":"integer","default":0,"required":false},"objectID":{"description":"Post id.","type":"integer","default":0,"required":false},"force":{"description":"Force update pagespeed.","type":"boolean","default":false,"required":false},"isAdminBar":{"description":"Is admin bar.","type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/getDesktopPagespeed"}]}},"\/rankmath\/v1\/an\/getMobilePagespeed":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"id":{"description":"Record id.","type":"integer","default":0,"required":false},"objectID":{"description":"Post id.","type":"integer","default":0,"required":false},"force":{"description":"Force update pagespeed.","type":"boolean","default":false,"required":false},"isAdminBar":{"description":"Is admin bar.","type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/getMobilePagespeed"}]}},"\/rankmath\/v1\/an\/getPageSEOScore":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"id":{"description":"Record id.","type":"integer","default":0,"required":false},"objectID":{"description":"Post id.","type":"integer","default":0,"required":false},"force":{"description":"Force update pagespeed.","type":"boolean","default":false,"required":false},"isAdminBar":{"description":"Is admin bar.","type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/getPageSEOScore"}]}},"\/rankmath\/v1\/an\/postsRows":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/postsRows"}]}},"\/rankmath\/v1\/an\/inspectionStats":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/inspectionStats"}]}},"\/rankmath\/v1\/pingSettings":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"apiKey":{"description":"API Key.","type":"string","required":true},"username":{"description":"Username.","type":"string","required":true},"plan":{"description":"Plan.","type":"string","required":true},"keywords":{"description":"Keywords.","type":"string","required":true},"settings":{"description":"Settings.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/pingSettings"}]}},"\/rankmath\/v1\/searchIntent":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyword":{"description":"The keyword used to determine the intent.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/searchIntent"}]}},"\/rankmath\/v1\/importCSV":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/importCSV"}]}},"\/rankmath\/v1\/cancelCsvImport":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/cancelCsvImport"}]}},"\/wordfence-login-security\/v1":{"namespace":"wordfence-login-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wordfence-login-security\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wordfence-login-security\/v1"}]}},"\/wordfence-login-security\/v1\/internal\/passkey-login\/begin":{"namespace":"wordfence-login-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wordfence-login-security\/v1\/internal\/passkey-login\/begin"}]}},"\/wordfence-login-security\/v1\/internal\/passkey-login\/finish":{"namespace":"wordfence-login-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wordfence-login-security\/v1\/internal\/passkey-login\/finish"}]}},"\/wordfence\/v1":{"namespace":"wordfence\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wordfence\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wordfence\/v1"}]}},"\/wordfence\/v1\/authenticate":{"namespace":"wordfence\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wordfence\/v1\/authenticate"}]}},"\/wordfence\/v1\/config":{"namespace":"wordfence\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wordfence\/v1\/config"}]}},"\/wordfence\/v1\/disconnect":{"namespace":"wordfence\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wordfence\/v1\/disconnect"}]}},"\/wordfence\/v1\/scan\/issues":{"namespace":"wordfence\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wordfence\/v1\/scan\/issues"}]}},"\/wordfence\/v1\/scan":{"namespace":"wordfence\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wordfence\/v1\/scan"}]}},"\/wordfence\/v1\/scan\/issue":{"namespace":"wordfence\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wordfence\/v1\/scan\/issue"}]}},"\/wpml\/st\/v1":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/st\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/st\/v1"}]}},"\/wpml\/st\/v1\/strings\/settings":{"namespace":"wpml\/st\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":{"autoregisterType":{"type":"integer","default":0,"required":false},"shouldRegisterBackendStrings":{"type":"integer","default":0,"required":false},"setNoticeThatCachePluginCanBlockAutoregisterAsDismissed":{"type":"integer","default":0,"required":false},"setDetectStringsInJS":{"type":"integer","default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/st\/v1\/strings\/settings"}]}},"\/wpml\/st\/v1\/strings\/itemscount":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"type":"integer","default":null,"required":false},"type":{"type":"string","required":false},"source":{"type":"integer","default":null,"required":false},"domain":{"type":"string","default":null,"required":false},"translationPriority":{"type":"string","default":null,"required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/st\/v1\/strings\/itemscount"}]}},"\/wpml\/st\/v1\/strings":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"type":"integer","default":null,"required":false},"type":{"type":"string","required":false},"source":{"type":"integer","default":null,"required":false},"domain":{"type":"string","default":null,"required":false},"translationPriority":{"type":"string","default":null,"required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/st\/v1\/strings"}]}},"\/wpml\/st\/v1\/strings\/filters":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"type":"integer","default":null,"required":false},"type":{"type":"string","required":false},"source":{"type":"integer","default":null,"required":false},"domain":{"type":"string","default":null,"required":false},"translationPriority":{"type":"string","default":null,"required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/st\/v1\/strings\/filters"}]}},"\/wpml\/st\/v1\/string-packages":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"type":"string","required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/st\/v1\/string-packages"}]}},"\/wpml\/st\/v1\/strings\/processstringsqueue":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/st\/v1\/strings\/processstringsqueue"}]}},"\/wpml\/tm\/v1":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/tm\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/store":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_job_id":{"type":"string","required":true},"ate_job_data":{"type":"array","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/store"}]}},"\/wpml\/tm\/v1\/xliff\/fetch\/(?P<jobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wpml\/tm\/v1\/ams\/register_manager":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ams\/register_manager"}]}},"\/wpml\/tm\/v1\/ams\/synchronize\/translators":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ams\/synchronize\/translators"}]}},"\/wpml\/tm\/v1\/ams\/synchronize\/managers":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ams\/synchronize\/managers"}]}},"\/wpml\/tm\/v1\/ams\/status":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ams\/status"}]}},"\/wpml\/tm\/v1\/ams\/console":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ams\/console"}]}},"\/wpml\/tm\/v1\/ams\/engines":{"namespace":"wpml\/tm\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ams\/engines"}]}},"\/wpml\/tm\/v1\/ate\/jobs":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/(?P<ateJobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wpml\/tm\/v1\/jobs":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"local_job_ids":{"type":"string","required":false},"scope":{"type":"string","required":false},"id":{"type":"integer","required":false},"job_id":{"type":"integer","required":false},"title":{"type":"string","required":false},"source_language":{"type":"string","required":false},"target_language":{"type":"string","required":false},"status":{"type":"string","required":false},"needs_update":{"type":"string","required":false},"limit":{"type":"integer","required":false},"offset":{"type":"integer","required":false},"sorting":{"required":false},"translated_by":{"type":"string","required":false},"sent_from":{"type":"string","required":false},"sent_to":{"type":"string","required":false},"deadline_from":{"type":"string","required":false},"deadline_to":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/jobs"}]}},"\/wpml\/tm\/v1\/jobs\/assign":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"jobId":{"required":true},"type":{"required":false},"translatorId":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/jobs\/assign"}]}},"\/wpml\/tm\/v1\/jobs\/cancel":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/jobs\/cancel"}]}},"\/wpml\/tm\/v1\/jobs\/in-flight-charged":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/jobs\/in-flight-charged"}]}},"\/wpml\/tm\/v1\/tp\/xliff\/download\/(?P<job_id>\\d+)\/(?P<job_type>\\w+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"job_id":{"required":true},"job_type":{"required":true},"json":{"type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wpml\/tm\/v1\/tp\/apply-translations":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/tp\/apply-translations"}]}},"\/wpml\/tm\/v1\/tp\/batches\/sync":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"batchId":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/tp\/batches\/sync"}]}},"\/wpml\/tm\/v1\/tp\/batches\/status":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/tp\/batches\/status"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/sync":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"lockKey":{"type":"string","required":false},"ateToken":{"type":"string","required":false},"page":{"type":"int","required":false},"numberOfPages":{"type":"int","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/sync"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/download":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/download"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/retry":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/retry"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/receive\/(?P<wpmlJobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpmlJobId":{"type":"int","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wpml\/tm\/v1\/ate\/jobs\/public\/create":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"site_identifier":{"type":"string","required":true},"check":{"type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/public\/create"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/(?P<ateJobId>\\d+)\/fix":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wpml\/tm\/v1\/ate\/pull\/collect":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"token":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ate\/pull\/collect"}]}},"\/wpml\/tm\/v1\/ate\/pull\/ping":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"tabId":{"type":"string","required":false},"force":{"type":"boolean","default":false,"required":false},"wake":{"type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/tm\/v1\/ate\/pull\/ping"}]}},"\/wpml\/ate\/v1":{"namespace":"wpml\/ate\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/ate\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/ate\/v1"}]}},"\/wpml\/ate\/v1\/ate\/proxy":{"namespace":"wpml\/ate\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/ate\/v1\/ate\/proxy"}]}},"\/wpml\/st\/v1\/import_mo_strings":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"plugins":{"type":"array","required":false},"themes":{"type":"array","required":false},"other":{"type":"array","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/st\/v1\/import_mo_strings"}]}},"\/wpml\/st\/v1\/pre_generate_mo_files":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/st\/v1\/pre_generate_mo_files"}]}},"\/wpml\/st\/v1\/settings":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"group":{"required":true},"key":{"required":true},"data":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/st\/v1\/settings"}]}},"\/wpml\/v1\/updates":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/updates"}]}},"\/wpml\/v1\/item-sections\/populated":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/item-sections\/populated"}]}},"\/wpml\/v1\/posts":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/posts"}]}},"\/wpml\/v1\/posts\/count":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/posts\/count"}]}},"\/wpml\/v1\/send-to-translation\/validate-translation-options":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"batchName":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/send-to-translation\/validate-translation-options"}]}},"\/wpml\/v1\/send-to-translation\/default-batch-name":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/send-to-translation\/default-batch-name"}]}},"\/wpml\/v1\/send-to-translation\/validate-batch-name":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"batchName":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/send-to-translation\/validate-batch-name"}]}},"\/wpml\/v1\/set-review-translation-option":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"reviewOption":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/set-review-translation-option"}]}},"\/wpml\/v1\/posts\/hierarchical":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"search":{"type":"string","required":false},"limit":{"type":"integer","required":false},"offset":{"type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/posts\/hierarchical"}]}},"\/wpml\/v1\/posts\/taxonomies":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"sourceLanguageCode":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/posts\/taxonomies"}]}},"\/wpml\/v1\/posts\/terms":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomyId":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"search":{"type":"string","required":false},"limit":{"type":"integer","required":false},"offset":{"type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/posts\/terms"}]}},"\/wpml\/v1\/translate-everything\/enable":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/translate-everything\/enable"}]}},"\/wpml\/v1\/translate-everything\/disable":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/translate-everything\/disable"}]}},"\/wpml\/v1\/translate-everything\/recheck-reachability":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/translate-everything\/recheck-reachability"}]}},"\/wpml\/v1\/cancelallautomaticjobs":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/cancelallautomaticjobs"}]}},"\/wpml\/v1\/getautomaticjobsinprogress":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/getautomaticjobsinprogress"}]}},"\/wpml\/v1\/getuntranslatedtypescount":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/getuntranslatedtypescount"}]}},"\/wpml\/v1\/save-translator-note":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/save-translator-note"}]}},"\/wpml\/v1\/translation-proxy\/commit-batch":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/translation-proxy\/commit-batch"}]}},"\/wpml\/v1\/tranlsation-proxy\/getlastpickedup":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/tranlsation-proxy\/getlastpickedup"}]}},"\/wpml\/v1\/translation-proxy\/getRemoteJobsCount":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/translation-proxy\/getRemoteJobsCount"}]}},"\/wpml\/v1\/gettranslationstatus":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/gettranslationstatus"}]}},"\/wpml\/v1\/getlocaltranslatorbyid":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"translatorId":{"type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/getlocaltranslatorbyid"}]}},"\/wpml\/v1\/reloadremotetranslationservice":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/reloadremotetranslationservice"}]}},"\/wpml\/v1\/gettranslationeditortype":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/gettranslationeditortype"}]}},"\/wpml\/v1\/translate-existing-content":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/translate-existing-content"}]}},"\/wpml\/v1\/get-needs-update-count-created-in-cte":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/get-needs-update-count-created-in-cte"}]}},"\/wpml\/v1\/get-engines":{"namespace":"wpml\/v1","methods":["GET","GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/get-engines"}]}},"\/wpml\/v1\/website-contexts":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/website-contexts"}]}},"\/wpml\/v1\/has-posts-using-native-editor":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/has-posts-using-native-editor"}]}},"\/wpml\/v1\/get-credits-per-word":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/get-credits-per-word"}]}},"\/wpml\/v1\/get-words-to-translate-for-items":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/get-words-to-translate-for-items"}]}},"\/wpml\/v1\/get-words-to-translate-for-types":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/get-words-to-translate-for-types"}]}},"\/wpml\/v1\/save-automatic-translation-settings":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/save-automatic-translation-settings"}]}},"\/wpml\/v1\/support\/plugin-report":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/support\/plugin-report"}]}},"\/wpml\/v1\/support\/activate-repair-tools":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/support\/activate-repair-tools"}]}},"\/wpml\/v1\/troubleshooting\/posthog":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/troubleshooting\/posthog"}]}},"\/wpml\/v1\/troubleshooting\/remote-xml-config-log\/clear":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/troubleshooting\/remote-xml-config-log\/clear"}]}},"\/wpml\/v1\/support\/enable-alias-domain":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/support\/enable-alias-domain"}]}},"\/wpml\/v1\/support\/register-alias-domain":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/support\/register-alias-domain"}]}},"\/wpml\/v1\/support\/reset-alias-domain":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/support\/reset-alias-domain"}]}},"\/wpml\/v1\/tea-calculation-types":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/tea-calculation-types"}]}},"\/wpml\/v1\/tea-calculation-update-types-include":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/tea-calculation-update-types-include"}]}},"\/wpml\/v1\/tea-calculation-update-types-include-batch":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/tea-calculation-update-types-include-batch"}]}},"\/wpml\/v1\/tea-calculation-discard-pending-offer":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/tea-calculation-discard-pending-offer"}]}},"\/wpml\/v1\/tea-calculation-dismiss-parked-offer":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/tea-calculation-dismiss-parked-offer"}]}},"\/wpml\/v1\/tea-calculation-persist-offered-defaults":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/tea-calculation-persist-offered-defaults"}]}},"\/wpml\/v1\/tea-calculation-items":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/tea-calculation-items"}]}},"\/wpml\/v1\/get-eatewidget-data":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/get-eatewidget-data"}]}},"\/wpml\/v1\/get-migration-code":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/get-migration-code"}]}},"\/wpml\/v1\/account-balances":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/account-balances"}]}},"\/wpml\/v1\/credits":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/credits"}]}},"\/wpml\/v1\/getlocaltranslators":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/getlocaltranslators"}]}},"\/wpml\/v1\/glossary-count":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/glossary-count"}]}},"\/wpml\/v1\/normalized-suggestions-count":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/normalized-suggestions-count"}]}},"\/wpml\/v1\/dismiss-queued-retranslation-reminder":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/dismiss-queued-retranslation-reminder"}]}},"\/wpml\/v1\/dismiss-pending-suggestions-nudge":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/dismiss-pending-suggestions-nudge"}]}},"\/wpml\/v1\/enable-ate":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/enable-ate"}]}},"\/wpml\/v1\/get-dismissed-notices":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/get-dismissed-notices"}]}},"\/wpml\/v1\/minimum-requirements":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/minimum-requirements"}]}},"\/wpml\/v1\/rest\/status":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/rest\/status"}]}},"\/wpml\/v1\/posthog\/refresh-cache":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/posthog\/refresh-cache"}]}},"\/wpml\/v1\/dismiss-notice":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/dismiss-notice"}]}},"\/wpml\/v1\/dismiss-notice-per-user":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/dismiss-notice-per-user"}]}},"\/wpml\/v1\/cancel-jobs":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/cancel-jobs"}]}},"\/wpml\/v1\/unsolvable-jobs":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/unsolvable-jobs"}]}},"\/wpml\/v1\/resend-unsolvable-jobs":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/resend-unsolvable-jobs"}]}},"\/wpml\/v1\/wpml\/posthog\/capture-event":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/wpml\/posthog\/capture-event"}]}},"\/wpml\/v1\/capture\/event":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/capture\/event"}]}},"\/wpml\/v1\/wpml-proxy\/status":{"namespace":"wpml\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/wpml-proxy\/status"}]}},"\/wpml\/v1\/wpml-content-stats":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/wpml-content-stats"}]}},"\/wpml\/v1\/wpml-ph-make-external-request":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/wpml-ph-make-external-request"}]}},"\/wpml\/v1\/posthog\/dashboard-session":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wpml\/v1\/posthog\/dashboard-session"}]}},"\/mediaflow":{"namespace":"mediaflow","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mediaflow","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/mediaflow"}]}},"\/mediaflow\/token":{"namespace":"mediaflow","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/mediaflow\/token"}]}},"\/mediaflow\/files":{"namespace":"mediaflow","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/mediaflow\/files"}]}},"\/pods\/v1":{"namespace":"pods\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"pods\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/pods\/v1"}]}},"\/pods\/v1\/pods":{"namespace":"pods\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"return_type":{"description":"The type of data to return.","type":"string","default":"full","enum":["full","names","ids","count"],"required":false},"types":{"description":"A list of types to filter by.","items":{"type":"string"},"required":false},"ids":{"description":"A list of IDs to filter by.","items":{"type":"integer"},"required":false},"args":{"description":"A list of arguments to filter by.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"mode":{"type":"string","description":"The mode for creating the Pod.","default":"create","enum":["create","extend"],"required":false},"name":{"type":"string","description":"The name of the Pod.","required":false},"label":{"type":"string","description":"The plural label of the Pod.","required":false},"type":{"type":"string","description":"The type of the Pod.","enum":["post_type","taxonomy","cpt","ct","user","media","comment","pod","settings","internal"],"required":true},"storage":{"type":"string","description":"The storage used for the Pod.","default":"meta","enum":["meta","table","option","none"],"required":false},"label_singular":{"type":"string","description":"The singular label of the Pod.","required":false},"menu_name":{"type":"string","description":"The menu label of the Pod.","required":false},"menu_location":{"type":"string","description":"The menu location of the Pod.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/pods\/v1\/pods"}]}},"\/pods\/v1\/pods\/(?P<id>\\d+)":{"namespace":"pods\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","description":"The Pod ID.","required":true},"include_fields":{"type":"boolean","description":"Whether to include fields (default: off).","default":false,"required":false},"include_groups":{"type":"boolean","description":"Whether to include groups (default: off).","default":false,"required":false},"include_group_fields":{"type":"boolean","description":"Whether to include group fields (default: off).","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"integer","description":"The Pod ID.","required":true},"name":{"type":"string","description":"The new name of the Pod.","required":false},"label":{"type":"string","description":"The singular label of the Pod.","required":false},"args":{"description":"A list of additional options to save to the Pod.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"type":"integer","description":"The Pod ID.","required":true},"delete_all":{"type":"boolean","description":"Whether to delete all content for Pod (default: off).","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/pods\/v1\/pods\/(?P<slug>[\\w\\_\\-]+)":{"namespace":"pods\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"slug":{"type":"string","description":"The Pod slug.","required":true},"include_fields":{"type":"boolean","description":"Whether to include fields (default: off).","default":false,"required":false},"include_groups":{"type":"boolean","description":"Whether to include groups (default: off).","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"slug":{"type":"string","description":"The Pod slug.","required":true},"new_name":{"type":"string","description":"The new name of the Pod.","required":false},"label":{"type":"string","description":"The singular label of the Pod.","required":false},"args":{"description":"A list of additional options to save to the Pod.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"slug":{"type":"string","description":"The Pod slug.","required":true},"delete_all":{"type":"boolean","description":"Whether to delete all content for Pod (default: off).","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/pods\/v1\/fields":{"namespace":"pods\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"return_type":{"description":"The type of data to return.","type":"string","default":"full","enum":["full","names","names_ids","ids","key_names","count"],"required":false},"types":{"description":"A list of types to filter by.","items":{"type":"string"},"required":false},"ids":{"description":"A list of IDs to filter by.","items":{"type":"integer"},"required":false},"args":{"description":"A list of arguments to filter by.","required":false},"include_parent":{"type":"boolean","description":"Whether to include the parent Pod details (default: off).","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"pod_id":{"type":"string","description":"The Pod ID.","required":false},"pod":{"type":"string","description":"The Pod name.","required":false},"group_id":{"type":"string","description":"The Group ID.","required":false},"group":{"type":"string","description":"The Group name.","required":false},"name":{"type":"string","description":"The name of the Field.","required":false},"label":{"type":"string","description":"The singular label of the Field.","required":true},"type":{"type":"string","description":"The type of the Field.","enum":["text","website","phone","email","password","paragraph","wysiwyg","code","datetime","date","time","number","currency","file","avatar","oembed","pick","boolean","color","slug","heading","html"],"required":true},"args":{"description":"A list of additional options to save to the Field.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/pods\/v1\/fields"}]}},"\/pods\/v1\/fields\/(?P<id>\\d+)":{"namespace":"pods\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","description":"The Field ID.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"integer","description":"The Field ID.","required":true},"name":{"type":"string","description":"The new name of the Field.","required":false},"label":{"type":"string","description":"The singular label of the Field.","required":false},"type":{"type":"string","description":"The type of the Field.","required":false},"args":{"description":"A list of additional options to save to the Field.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"type":"integer","description":"The Field ID.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/pods\/v1\/pods\/(?P<pod>[\\w\\_\\-]+)\/fields\/(?P<slug>[\\w\\_\\-]+)":{"namespace":"pods\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"pod":{"type":"string","description":"The Pod slug.","required":true},"slug":{"type":"string","description":"The Field slug.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"pod":{"type":"string","description":"The Pod slug.","required":true},"slug":{"type":"string","description":"The Field slug.","required":true},"new_name":{"type":"string","description":"The new name of the Field.","required":false},"new_group":{"type":"string","description":"The new Group to use for the Field.","required":false},"new_group_id":{"type":"string","description":"The new Group ID to use for the Field.","required":false},"label":{"type":"string","description":"The singular label of the Field.","required":false},"type":{"type":"string","description":"The type of the Field.","required":false},"args":{"description":"A list of additional options to save to the Field.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"pod":{"type":"string","description":"The Pod slug.","required":true},"slug":{"type":"string","description":"The Field slug.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/pods\/v1\/groups":{"namespace":"pods\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"return_type":{"description":"The type of data to return.","type":"string","default":"full","enum":["full","names","names_ids","ids","key_names","count"],"required":false},"types":{"description":"A list of types to filter by.","items":{"type":"string"},"required":false},"ids":{"description":"A list of IDs to filter by.","items":{"type":"integer"},"required":false},"args":{"description":"A list of arguments to filter by.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"pod_id":{"type":"string","description":"The Pod ID.","required":false},"pod":{"type":"string","description":"The Pod name.","required":false},"name":{"type":"string","description":"The name of the Group.","required":false},"label":{"type":"string","description":"The singular label of the Group.","required":true},"args":{"description":"A list of additional options to save to the Group.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/pods\/v1\/groups"}]}},"\/pods\/v1\/groups\/(?P<id>\\d+)":{"namespace":"pods\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","description":"The Group ID.","required":true},"include_fields":{"type":"boolean","description":"Whether to include fields (default: off).","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"integer","description":"The Group ID.","required":true},"name":{"type":"string","description":"The new name of the Group.","required":false},"label":{"type":"string","description":"The singular label of the Group.","required":false},"type":{"type":"string","description":"The type of the Group.","required":false},"args":{"description":"A list of additional options to save to the Group.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"type":"integer","description":"The Group ID.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/pods\/v1\/pods\/(?P<pod>[\\w\\_\\-]+)\/groups\/(?P<slug>[\\w\\_\\-]+)":{"namespace":"pods\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"pod":{"type":"string","description":"The Pod slug.","required":true},"slug":{"type":"string","description":"The Group slug.","required":true},"include_fields":{"type":"boolean","description":"Whether to include fields (default: off).","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"pod":{"type":"string","description":"The Pod slug.","required":true},"slug":{"type":"string","description":"The Field slug.","required":true},"new_name":{"type":"string","description":"The new name of the Group.","required":false},"label":{"type":"string","description":"The singular label of the Group.","required":false},"type":{"type":"string","description":"The type of the Group.","required":false},"args":{"description":"A list of additional options to save to the Group.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"pod":{"type":"string","description":"The Pod slug.","required":true},"slug":{"type":"string","description":"The Group slug.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/pods\/v1\/doc":{"namespace":"pods\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/pods\/v1\/doc"}]}},"\/rankmath\/v1\/ai-visibility":{"namespace":"rankmath\/v1\/ai-visibility","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/ai-visibility","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ai-visibility"}]}},"\/rankmath\/v1\/ai-visibility\/overview":{"namespace":"rankmath\/v1\/ai-visibility","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"refresh":{"description":"Force a refresh from the AI Visibility API.","type":"boolean","default":false,"required":false},"search":{"description":"Filter brands by name or URL.","type":"string","default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ai-visibility\/overview"}]}},"\/rankmath\/v1\/ai-visibility\/brands\/(?P<id>[a-zA-Z0-9\\-]+)":{"namespace":"rankmath\/v1\/ai-visibility","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true},"name":{"type":"string","required":false},"url":{"type":"string","required":false},"description":{"type":"string","required":false},"locale":{"type":"string","required":false},"language":{"type":"string","enum":["","US English","UK English","Arabic","Bulgarian","Chinese","Czech","Danish","Dutch","Estonian","Finnish","French","German","Greek","Hebrew","Hungarian","Indonesian","Italian","Japanese","Korean","Latvian","Lithuanian","Norwegian","Polish","Portuguese","Romanian","Russian","Slovak","Slovenian","Spanish","Swedish","Turkish"],"required":false},"status":{"type":"string","enum":["active","inactive"],"required":false},"interval":{"type":"string","enum":["daily","weekly","monthly"],"required":false},"platforms":{"description":"AI platforms to track for this brand. Supported values: \"chatgpt\", \"gemini\". Tracking more than one platform per brand requires the Expert plan.","type":"array","minItems":1,"items":{"type":"string","enum":["chatgpt","gemini"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/rankmath\/v1\/ai-visibility\/brands":{"namespace":"rankmath\/v1\/ai-visibility","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"name":{"description":"Brand name.","type":"string","required":true},"url":{"description":"Brand website URL or domain.","type":"string","required":true},"description":{"description":"Short description of the brand or product.","type":"string","required":true},"locale":{"description":"ISO 3166-1 alpha-2 country code (e.g. &quot;US&quot;, &quot;HU&quot;).","type":"string","required":false},"language":{"description":"Output language to use when analyzing\/generating content for this brand. Independent of `locale` (target country). Required; immutable after creation.","type":"string","enum":["US English","UK English","Arabic","Bulgarian","Chinese","Czech","Danish","Dutch","Estonian","Finnish","French","German","Greek","Hebrew","Hungarian","Indonesian","Italian","Japanese","Korean","Latvian","Lithuanian","Norwegian","Polish","Portuguese","Romanian","Russian","Slovak","Slovenian","Spanish","Swedish","Turkish"],"required":true},"interval":{"description":"Analysis refresh cadence. Omitted \u2192 backend applies the account plan&#039;s default.","type":"string","enum":["daily","weekly","monthly"],"required":false},"platforms":{"description":"AI platforms to track for this brand. Supported values: \"chatgpt\", \"gemini\". Tracking more than one platform per brand requires the Expert plan.","type":"array","minItems":1,"items":{"type":"string","enum":["chatgpt","gemini"]},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ai-visibility\/brands"}]}},"\/rankmath\/v1\/ai-visibility\/brands\/(?P<id>[a-zA-Z0-9\\-]+)\/insights":{"namespace":"rankmath\/v1\/ai-visibility","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/rankmath\/v1\/ai-visibility\/brands\/(?P<id>[a-zA-Z0-9\\-]+)\/queries":{"namespace":"rankmath\/v1\/ai-visibility","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/rankmath\/v1\/ai-visibility\/brands\/(?P<id>[a-zA-Z0-9\\-]+)\/queries\/(?P<qid>[a-zA-Z0-9\\-]+)":{"namespace":"rankmath\/v1\/ai-visibility","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true},"qid":{"description":"Query UUID.","type":"string","required":true},"enabled":{"description":"Whether the query is enabled for analysis.","type":"boolean","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/rankmath\/v1\/ai-visibility\/brands\/(?P<id>[a-zA-Z0-9\\-]+)\/generate-queries":{"namespace":"rankmath\/v1\/ai-visibility","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/rankmath\/v1\/ai-visibility\/trial\/activate":{"namespace":"rankmath\/v1\/ai-visibility","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ai-visibility\/trial\/activate"}]}},"\/rankmath\/v1\/ai-visibility\/checkout-url":{"namespace":"rankmath\/v1\/ai-visibility","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ai-visibility\/checkout-url"}]}},"\/rankmath\/v1\/ca":{"namespace":"rankmath\/v1\/ca","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/ca","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca"}]}},"\/rankmath\/v1\/ca\/researchKeyword":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyword":{"description":"The keyword to be researched.","type":"string","required":true},"country":{"description":"The country for which the keyword should be researched.","type":"string","required":true},"objectID":{"description":"The ID of the post initiating the keyword research request.","type":"integer","required":true},"force_update":{"description":"If true, forces a fresh research request.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca\/researchKeyword"}]}},"\/rankmath\/v1\/ca\/getCredits":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca\/getCredits"}]}},"\/rankmath\/v1\/ca\/createPost":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"content":{"description":"The content of the new post.","type":"string","required":true},"title":{"description":"The title of the new post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca\/createPost"}]}},"\/rankmath\/v1\/ca\/saveOutput":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"outputs":{"description":"An array of AI-generated and existing outputs to be saved.","type":"array","required":false},"endpoint":{"description":"The API endpoint for which the output was generated.","type":"string","required":false},"isChat":{"description":"Indicates if the request was for the Chat endpoint.","type":"boolean","required":false},"attributes":{"description":"The parameters used to generate the AI output.","type":"object","required":false},"credits":{"description":"Credit usage details returned by the API.","type":"object","required":false},"usage":{"description":"Per-tool usage data returned by the API.","type":"object","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca\/saveOutput"}]}},"\/rankmath\/v1\/ca\/deleteOutput":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"isChat":{"description":"Indicates if the request to delete the output was for the Chat endpoint.","type":"boolean","required":false},"index":{"description":"The output index to delete, applicable only to the Chat endpoint.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca\/deleteOutput"}]}},"\/rankmath\/v1\/ca\/updateRecentPrompt":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"prompt":{"description":"The selected prompt to be updated in the recent prompts.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca\/updateRecentPrompt"}]}},"\/rankmath\/v1\/ca\/updatePrompt":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"prompt":{"description":"The prompt data to be saved in the database.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca\/updatePrompt"}]}},"\/rankmath\/v1\/ca\/savePrompts":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"prompts":{"description":"A list of prompts received from the API to be saved in the database.","type":"array","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca\/savePrompts"}]}},"\/rankmath\/v1\/ca\/pingContentAI":{"namespace":"rankmath\/v1\/ca","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"plan":{"description":"Rank Math AI plan to update in the Database.","type":"string","required":true},"refreshDate":{"description":"Content AI reset date to update in the Database","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca\/pingContentAI"}]}},"\/rankmath\/v1\/ca\/generateAlt":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"attachmentIds":{"description":"List of attachment IDs for which to generate alt text.","type":"array","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca\/generateAlt"}]}},"\/rankmath\/v1\/ca\/updateCredits":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"credits":{"description":"Credit usage details returned by the API.","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/ca\/updateCredits"}]}},"\/rankmath\/v1\/an\/dashboard":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/dashboard"}]}},"\/rankmath\/v1\/an\/keywordsOverview":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/keywordsOverview"}]}},"\/rankmath\/v1\/an\/postsSummary":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/postsSummary"}]}},"\/rankmath\/v1\/an\/postsRowsByObjects":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","required":false},"per_page":{"description":"Results per page.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/postsRowsByObjects"}]}},"\/rankmath\/v1\/an\/post\/(?P<id>\\d+)":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Post ID.","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/rankmath\/v1\/an\/keywordsSummary":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/keywordsSummary"}]}},"\/rankmath\/v1\/an\/analyticsSummary":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"postType":{"description":"Post Type.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/analyticsSummary"}]}},"\/rankmath\/v1\/an\/keywordsRows":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","required":false},"perPage":{"description":"Results per page.","type":"integer","required":false},"orderBy":{"description":"Order by.","type":"string","required":false},"order":{"description":"Order.","type":"string","required":false},"search":{"description":"Search.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/keywordsRows"}]}},"\/rankmath\/v1\/an\/userPreferences":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"preferences":{"description":"User preferences.","type":"object","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/userPreferences"}]}},"\/rankmath\/v1\/an\/inspectionResults":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","required":false},"perPage":{"description":"Results per page.","type":"integer","required":false},"orderBy":{"description":"Order by.","type":"string","required":false},"order":{"description":"Order.","type":"string","required":false},"search":{"description":"Search.","type":"string","required":false},"filter":{"description":"Filter.","type":"string","required":false},"filterType":{"description":"Filter type.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/inspectionResults"}]}},"\/rankmath\/v1\/an\/removeFrontendStats":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"toggleBar":{"description":"Toggle bar.","type":"boolean","required":false},"hide":{"description":"Hide.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/an\/removeFrontendStats"}]}},"\/rankmath\/v1\/in":{"namespace":"rankmath\/v1\/in","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/in","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/in"}]}},"\/rankmath\/v1\/in\/submitUrls":{"namespace":"rankmath\/v1\/in","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"urls":{"description":"The list of urls to submit to the Instant Indexing API.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/in\/submitUrls"}]}},"\/rankmath\/v1\/in\/getLog":{"namespace":"rankmath\/v1\/in","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"filter":{"description":"Filter log by type.","type":"string","enum":["all","manual","auto"],"default":"all","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/in\/getLog"}]}},"\/rankmath\/v1\/in\/clearLog":{"namespace":"rankmath\/v1\/in","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filter":{"description":"Clear log by type.","type":"string","enum":["all","manual","auto"],"default":"all","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/in\/clearLog"}]}},"\/rankmath\/v1\/in\/resetKey":{"namespace":"rankmath\/v1\/in","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/in\/resetKey"}]}},"\/rankmath\/v1\/status":{"namespace":"rankmath\/v1\/status","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/status","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/status"}]}},"\/rankmath\/v1\/status\/getViewData":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/status\/getViewData"}]}},"\/rankmath\/v1\/status\/updateViewData":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/status\/updateViewData"}]}},"\/rankmath\/v1\/status\/importSettings":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/status\/importSettings"}]}},"\/rankmath\/v1\/status\/exportSettings":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/status\/exportSettings"}]}},"\/rankmath\/v1\/status\/runBackup":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath\/v1\/status\/runBackup"}]}},"\/eap-accordion\/v2":{"namespace":"eap-accordion\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"eap-accordion\/v2","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/eap-accordion\/v2"}]}},"\/eap-accordion\/v2\/get_premade_patterns":{"namespace":"eap-accordion\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/eap-accordion\/v2\/get_premade_patterns"}]}},"\/eap-accordion\/v2\/save_wishlist_item":{"namespace":"eap-accordion\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/eap-accordion\/v2\/save_wishlist_item"}]}},"\/otgs\/installer\/v1":{"namespace":"otgs\/installer\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"otgs\/installer\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/otgs\/installer\/v1"}]}},"\/otgs\/installer\/v1\/push\/fetch-subscription":{"namespace":"otgs\/installer\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/otgs\/installer\/v1\/push\/fetch-subscription"}]}},"\/rankmath-marketplace\/v1":{"namespace":"rankmath-marketplace\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath-marketplace\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath-marketplace\/v1"}]}},"\/rankmath-marketplace\/v1\/plugins":{"namespace":"rankmath-marketplace\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/rankmath-marketplace\/v1\/plugins"}]}},"\/rankmath-marketplace\/v1\/plugins\/active\/(?P<slug>[a-zA-Z0-9-_]+)":{"namespace":"rankmath-marketplace\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limit result set to items that are sticky.","type":"boolean","required":false},"ignore_sticky":{"description":"Whether to ignore sticky posts or not.","type":"boolean","default":true,"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"media_type":{"default":null,"description":"Limit result set to attachments of a particular media type or media types.","type":"array","items":{"type":"string","enum":["image","video","text","application","audio"]},"required":false},"mime_type":{"default":null,"description":"Limit result set to attachments of a particular MIME type or MIME types.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"generate_sub_sizes":{"type":"boolean","default":true,"description":"Whether to generate image sub sizes.","required":false},"convert_format":{"type":"boolean","default":true,"description":"Whether to convert image formats.","required":false},"url":{"type":"string","format":"uri","description":"URL of an external image to sideload into the media library, instead of uploading a file.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL to the edited image file.","type":"string","format":"uri","required":true},"modifiers":{"description":"Array of image edits.","type":"array","minItems":1,"items":{"description":"Image edit.","type":"object","required":["type","args"],"oneOf":[{"title":"Flip","properties":{"type":{"description":"Flip type.","type":"string","enum":["flip"]},"args":{"description":"Flip arguments.","type":"object","required":["flip"],"properties":{"flip":{"description":"Flip direction.","type":"object","required":["horizontal","vertical"],"properties":{"horizontal":{"description":"Whether to flip in the horizontal direction.","type":"boolean"},"vertical":{"description":"Whether to flip in the vertical direction.","type":"boolean"}}}}}}},{"title":"Rotation","properties":{"type":{"description":"Rotation type.","type":"string","enum":["rotate"]},"args":{"description":"Rotation arguments.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle to rotate clockwise in degrees.","type":"number"}}}}},{"title":"Crop","properties":{"type":{"description":"Crop type.","type":"string","enum":["crop"]},"args":{"description":"Crop arguments.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Horizontal position from the left to begin the crop as a percentage of the image width.","type":"number"},"top":{"description":"Vertical position from the top to begin the crop as a percentage of the image height.","type":"number"},"width":{"description":"Width of the crop as a percentage of the image width.","type":"number"},"height":{"description":"Height of the crop as a percentage of the image height.","type":"number"}}}}}]},"required":false},"rotation":{"description":"The amount to rotate the image clockwise in degrees. DEPRECATED: Use `modifiers` instead.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"As a percentage of the image, the x position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"As a percentage of the image, the y position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"As a percentage of the image, the width to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"As a percentage of the image, the height to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/sideload":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"image_size":{"description":"Image size. Can be a single size name or an array of size names to register the same file under multiple sizes.","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"convert_format":{"type":"boolean","default":true,"description":"Whether to convert image formats.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/finalize":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"sub_sizes":{"description":"Array of sub-size metadata collected from sideload responses.","type":"array","default":[],"maxItems":100,"items":{"type":"object","properties":{"image_size":{"description":"Size name, or an array of size names when a single file is registered under multiple sizes with matching dimensions.","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"width":{"type":"integer","minimum":1},"height":{"type":"integer","minimum":1},"file":{"type":"string","minLength":1},"mime_type":{"type":"string","pattern":"^image\/.*"},"filesize":{"type":"integer","minimum":1},"original_image":{"type":"string","minLength":1}}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limit result set to items with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limit result set to items except those with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"parent":{"default":0,"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"default":1,"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"default":0,"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limit result set to items with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the global styles revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the global styles revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\d+]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"ID of global styles config.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"Global styles.","type":["object"],"required":false},"settings":{"description":"Global settings.","type":["object"],"required":false},"title":{"description":"Title of the global styles variation.","type":["object","string"],"properties":{"raw":{"description":"Title for the global styles variation, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"font-face declaration in theme.json format, encoded as a string.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sp_eap_template":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/sp_eap_template"}]}},"\/wp\/v2\/sp_eap_template\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sp_eap_template\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sp_eap_template\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sp_eap_template\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sp_eap_template\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sp_easy_accordion":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/sp_easy_accordion"}]}},"\/wp\/v2\/sp_easy_accordion\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sp_accordion_faqs":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/sp_accordion_faqs"}]}},"\/wp\/v2\/sp_accordion_faqs\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sp_accordion_faqs\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sp_accordion_faqs\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sp_accordion_faqs\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sp_accordion_faqs\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/person":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/person"}]}},"\/wp\/v2\/person\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/rm_content_editor":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/rm_content_editor"}]}},"\/wp\/v2\/rm_content_editor\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/rm_content_editor\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/rm_content_editor\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/rank_math_schema":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/rank_math_schema"}]}},"\/wp\/v2\/rank_math_schema\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"An alphanumeric identifier for the post type.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"An alphanumeric identifier for the status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limit results to taxonomies associated with a specific post type.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"An alphanumeric identifier for the taxonomy.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face","sp_eap_template":"sp_eap_template","sp_easy_accordion":"sp_easy_accordion","sp_accordion_faqs":"sp_accordion_faqs","person":"person","rm_content_editor":"rm_content_editor","rank_math_schema":"rank_math_schema"}},"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"username":{"description":"Login name for the user.","type":"string","required":true},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":true},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","sv_SE"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":true},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/users"}]}},"\/wp\/v2\/users\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","sv_SE"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","sv_SE"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limit result set to that from a specific author email. Requires authorization.","format":"email","type":"string","required":false},"before":{"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by comment attribute.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorization.","type":"string","required":false},"type":{"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorization.","type":"string","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"default":0,"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"type":{"default":"post","description":"Limit results to items of an object type.","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"Limit results to items of one or more object subtypes.","type":"array","items":{"enum":["post","page","sp_accordion_faqs","category","post_tag","any"],"type":"string"},"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Unique registered name for the block.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributes for the block.","type":"object","default":[],"required":false},"post_id":{"description":"ID of the post context.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Block name.","type":"string","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"wordpress_api_key":{"title":"Akismet Anti-spam API Key","description":"API key for the Akismet Anti-spam connector.","type":"string","required":false},"title":{"title":"Title","description":"Site title.","type":"string","required":false},"description":{"title":"Tagline","description":"Site tagline.","type":"string","required":false},"url":{"title":"","description":"Site URL.","type":"string","format":"uri","required":false},"email":{"title":"","description":"This address is used for admin purposes, like new user notification.","type":"string","format":"email","required":false},"timezone":{"title":"","description":"A city in the same timezone as you.","type":"string","required":false},"date_format":{"title":"","description":"A date format for all date strings.","type":"string","required":false},"time_format":{"title":"","description":"A time format for all time strings.","type":"string","required":false},"start_of_week":{"title":"","description":"A day number of the week that the week should start on.","type":"integer","required":false},"language":{"title":"","description":"WordPress locale code.","type":"string","required":false},"use_smilies":{"title":"","description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean","required":false},"default_category":{"title":"","description":"Default post category.","type":"integer","required":false},"default_post_format":{"title":"","description":"Default post format.","type":"string","required":false},"posts_per_page":{"title":"Maximum posts per page","description":"Blog pages show at most.","type":"integer","required":false},"show_on_front":{"title":"Show on front","description":"What to show on the front page","type":"string","required":false},"page_on_front":{"title":"Page on front","description":"The ID of the page that should be displayed on the front page","type":"integer","required":false},"page_for_posts":{"title":"","description":"The ID of the page that should display the latest posts","type":"integer","required":false},"default_ping_status":{"title":"","description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"Allow comments on new posts","description":"Allow people to submit comments on new posts.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"Site logo.","type":"integer","required":false},"site_icon":{"title":"Icon","description":"Site icon.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme's stylesheet. This uniquely identifies the theme.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a registered sidebar","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Nested widgets.","type":"array","items":{"type":["object","string"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The widget type id.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"form_data":{"description":"Serialized widget form data to encode into instance settings.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"The sidebar to return widgets for.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"The sidebar the widget belongs to.","type":"string","required":true},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"description":"The sidebar the widget belongs to.","type":"string","required":false},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Whether to force removal of the widget, or move it to the inactive sidebar.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limit result set to blocks matching the search term.","type":"string","minLength":1,"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","minLength":1,"required":false},"category":{"description":"Limit results to those matching a category ID.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limit results to those matching a keyword ID.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limit results to those matching a pattern (slug).","type":"array","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to process.","type":"string","format":"uri","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"An alphanumeric identifier for the menu location.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp-abilities\/v1":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-abilities\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-abilities\/v1"}]}},"\/wp-abilities\/v1\/categories":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-abilities\/v1\/categories"}]}},"\/wp-abilities\/v1\/categories\/(?P<slug>[a-z0-9]+(?:-[a-z0-9]+)*)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Unique identifier for the ability category.","type":"string","pattern":"^[a-z0-9]+(?:-[a-z0-9]+)*$","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+?)\/run":{"namespace":"wp-abilities\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"input":{"description":"Input parameters for the ability execution.","type":["integer","number","boolean","string","array","object","null"],"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp-abilities\/v1\/abilities":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"category":{"description":"Limit results to abilities in specific ability category.","type":"string","required":false},"namespace":{"description":"Limit results to abilities in a specific namespace.","type":"string","required":false},"meta":{"description":"Limit results to abilities matching all of the given meta fields.","type":"object","properties":{"annotations":{"description":"Limit results to abilities matching the given behavioral annotations.","type":"object","properties":{"readonly":{"description":"Whether the ability does not modify its environment.","type":["boolean","null"]},"destructive":{"description":"Whether the ability may perform destructive updates to its environment.","type":["boolean","null"]},"idempotent":{"description":"Whether repeated calls with the same arguments have no additional effect.","type":["boolean","null"]}},"additionalProperties":true}},"additionalProperties":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp-abilities\/v1\/abilities"}]}},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/icons":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"collection":{"description":"Limit results to icons belonging to the given collection slug.","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/icons"}]}},"\/wp\/v2\/icons\/(?P<collection>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"collection":{"description":"Limit results to icons belonging to the given collection slug.","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/icons\/(?P<name>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?\/[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Icon name.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/icon-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/icon-collections"}]}},"\/wp\/v2\/icon-collections\/(?P<slug>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Icon collection slug.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}]},"\/wp\/v2\/view-config":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"description":"Entity kind.","type":"string","required":true},"name":{"description":"Entity name.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","sv"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/view-config"}]}}},"site_logo":30965,"site_icon":0,"site_icon_url":"","_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}],"wp:featuredmedia":[{"embeddable":true,"type":"site_logo","href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media\/30965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}