{"id":1246,"date":"2021-04-08T08:44:31","date_gmt":"2021-04-08T08:44:31","guid":{"rendered":"https:\/\/nyatunnelbanan.se\/2021\/04\/08\/still-popular-expansion-despite-construction-disruptions-and-interruptions\/"},"modified":"2021-12-03T14:21:01","modified_gmt":"2021-12-03T14:21:01","slug":"still-popular-expansion-despite-construction-disruptions-and-interruptions","status":"publish","type":"post","link":"https:\/\/nyatunnelbanan.se\/en\/news\/still-popular-expansion-despite-construction-disruptions-and-interruptions\/","title":{"rendered":"Still a popular expansion \u2013 despite construction disruptions and interruptions"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><span style=\"font-size: 14px;\">Since the first major survey was carried out in 2015, the public acceptance of the metro expansion has remained steady in at least 9 out of 10 responders. There are many choosing grades 3, 4 or 5 to the question &#8220;What is your attitude to the expansion of the metro?&#8221;.&nbsp;<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: 14px;\">Head of communications Marianne Dun\u00e9r has worked on several major projects:<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: 14px;\">\u2013&nbsp;We had expected a lower result now that we are working on all the things that disturb the surroundings. We are seeing a small decrease, but the fact that we get such nice reviews from people living in the vicinity of the construction is both great and unusual,&nbsp;she says.&nbsp;<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: 14px;\">&nbsp;<\/span><\/p>\n\n\n\n<figure class=\"wp-block-image\"><a href=\"https:\/\/nyatunnelbanan.se\/sites\/tunnelbanan\/files\/diagram_0.png\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/02\/Attityddiagram_1.png\" alt=\"\" class=\"wp-image-1179\"\/><\/a><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Click on the chart to see a larger version.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: 14px;\">There is a little difference between the different projects. For example are only 6% i Barkarby negative, grades 1 or 2, despite the construction being in full swing. The depot project scores lower, with 12% grades 1 or 2, although no major works have started there.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: 14px;\">\u2013&nbsp;We will be looking at the open answers and the answers to other questions in order to evaluate this. But one thing I can think of is that it may be that the usefulness of the metro is very evident for people living in Barkarby, while it is more difficult to see any immediate gain from the depot expansion in H\u00f6gdalen. Here we need to clarify the usefulness of the depot, such as clean, well maintained trains, says head of communications Marianne Dun\u00e9r.&nbsp;<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: 14px;\">Do you want to read the entire survey?&nbsp;<br><img decoding=\"async\" title=\"application\/pdf\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2016\/02\/application-pdf.png\" alt=\"PDF icon\"> <a href=\"https:\/\/nyatunnelbanan.se\/sites\/tunnelbanan\/files\/Nya%20tunnelbanan%20-%20Totalrapport%20Attitydunders%C3%B6kningar%202020%20-%202021-01-27.pdf\">The new metro &#8211; Total report Attitude surveys 2020<\/a><a href=\"https:\/\/nyatunnelbanan.se\/sites\/tunnelbanan\/files\/Nya%20tunnelbanan%20-%20Totalrapport%20Attitydunders%C3%B6kningar%202020%20-%202021-01-27.pdf\" type=\"application\/pdf; length=450722\">.pdf<\/a>&nbsp;(In swedish)&nbsp;<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Each year the attitude towards the metro construction is surveyed among those living or being close to our building sites.<\/p>\n","protected":false},"author":3,"featured_media":5682,"comment_status":"closed","ping_status":"open","sticky":false,"template":"templates\/template-press-news.php","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-1246","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/1246","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/comments?post=1246"}],"version-history":[{"count":1,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/1246\/revisions"}],"predecessor-version":[{"id":13053,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/1246\/revisions\/13053"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media\/5682"}],"wp:attachment":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media?parent=1246"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/categories?post=1246"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/tags?post=1246"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}