{"id":13772,"date":"2021-12-21T09:19:52","date_gmt":"2021-12-21T09:19:52","guid":{"rendered":"https:\/\/nyatunnelbanan.se\/?p=13772"},"modified":"2021-12-21T09:21:28","modified_gmt":"2021-12-21T09:21:28","slug":"check-on-all-larger-rock-contracts","status":"publish","type":"post","link":"https:\/\/nyatunnelbanan.se\/en\/news\/check-on-all-larger-rock-contracts\/","title":{"rendered":"Check on all larger rock contracts"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The procurements of all major rock contracts are now either complete or in progress. Those in progress are the&nbsp;Hammarby&nbsp;kanal,&nbsp;Slakthusomr\u00e5det,&nbsp;J\u00e4rla&nbsp;in Nacka, S\u00f6dra&nbsp;Hagalund&nbsp;and the underground connection track between the depot in&nbsp;H\u00f6gdalen&nbsp;and the tracks towards&nbsp;Farsta. All are expected to be completed in the spring of 2022.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8211; It\u2019s&nbsp;clear that we\u2019re&nbsp;on our way to a new stage.&nbsp; Focus next year is on procurement in construction, installations and BEST &#8211; everything that will make the tunnels to a metro, says procurement manager Iveta Sandstr\u00f6m.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"200\" height=\"260\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/Iveta_Sandstrom.jpg\" alt=\"Iveta Sandstr\u00f6m, upphandlingschef\" class=\"wp-image-13767\"\/><figcaption>Iveta Sandstr\u00f6m, procurement manager.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Approximately half of the total sum of procurements in&nbsp;kronor is completed. The charts below show what percentage is done, what is in progress and how many are left to do.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/nyatunnelbanan.se\/current-procurements\/?lang=en\">Here you can see all current procurements<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the top&nbsp;you\u2019ll see&nbsp;the numbers for the entire expansion,&nbsp;following&nbsp;by&nbsp;each ongoing project.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The latest project, to build a metro to&nbsp;\u00c4lvsj\u00f6, is not included in the compilation.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/hela_eng.png\" alt=\"\" class=\"wp-image-13774\" width=\"200\" height=\"200\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/hela_eng.png 400w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/hela_eng-300x300.png 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/hela_eng-150x150.png 150w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/hela_eng-100x100.png 100w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"has-text-align-center wp-block-heading\">Entire expansion<\/h2>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">49 % done<br>24 % ongoing <br>27 % left to do<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/barkarby-eng.png\" alt=\"\" class=\"wp-image-13776\" width=\"200\" height=\"200\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/barkarby-eng.png 400w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/barkarby-eng-300x300.png 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/barkarby-eng-150x150.png 150w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/barkarby-eng-100x100.png 100w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"has-text-align-center wp-block-heading\">Barkarby<\/h2>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"> 96 % done<br>0 % ongoing<br>4 % left to do<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/arenastaden-eng.png\" alt=\"\" class=\"wp-image-13778\" width=\"200\" height=\"200\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/arenastaden-eng.png 400w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/arenastaden-eng-300x300.png 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/arenastaden-eng-150x150.png 150w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/arenastaden-eng-100x100.png 100w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"has-text-align-center wp-block-heading\">Arenastaden<\/h2>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">34 % done<br>32 % ongoing<br>32 % left to do<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/depot.png\" alt=\"\" class=\"wp-image-13780\" width=\"200\" height=\"200\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/depot.png 400w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/depot-300x300.png 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/depot-150x150.png 150w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/depot-100x100.png 100w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"has-text-align-center wp-block-heading\">Depot<\/h2>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">41 % done<br>56 % ongoing<br>3 % left to do<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/nackasodersoderort_eng.png\" alt=\"\" class=\"wp-image-13782\" width=\"200\" height=\"200\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/nackasodersoderort_eng.png 400w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/nackasodersoderort_eng-300x300.png 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/nackasodersoderort_eng-150x150.png 150w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2021\/12\/nackasodersoderort_eng-100x100.png 100w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"has-text-align-center wp-block-heading\">Nacka, S\u00f6dermalm, S\u00f6derort<\/h2>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">44 % done<br>20 % ongoing<br>36 % left to do<\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The end of the year is approaching and everything is about to be summed up. If you look at how many of our procurements that are ready, ongoing and still left to do, it looks like this. <\/p>\n","protected":false},"author":3,"featured_media":13703,"comment_status":"closed","ping_status":"open","sticky":false,"template":"templates\/template-press-news.php","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[87,149],"tags":[],"class_list":["post-13772","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-upphandling-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/13772","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/comments?post=13772"}],"version-history":[{"count":7,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/13772\/revisions"}],"predecessor-version":[{"id":13804,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/13772\/revisions\/13804"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media\/13703"}],"wp:attachment":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media?parent=13772"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/categories?post=13772"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/tags?post=13772"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}