{"id":187,"date":"2016-11-07T07:47:53","date_gmt":"2016-11-07T07:47:53","guid":{"rendered":"https:\/\/nyatunnelbanan.se\/2016\/11\/07\/andrapris-i-den-stora-infrastrukturtavlingen-be-inspired-awards\/"},"modified":"2021-12-03T14:19:54","modified_gmt":"2021-12-03T14:19:54","slug":"andrapris-i-den-stora-infrastrukturtavlingen-be-inspired-awards","status":"publish","type":"post","link":"https:\/\/nyatunnelbanan.se\/en\/news\/andrapris-i-den-stora-infrastrukturtavlingen-be-inspired-awards\/","title":{"rendered":"Andrapris i den stora infrastrukturt\u00e4vlingen Be Inspired Awards"},"content":{"rendered":"<address><span style=\"font-size: 18px;\">Det blev ett andrapris i kategorin \u201dInnovation in Rail and Transit\u201d i 2016 \u00e5rs Be Inspired Awards. T\u00e4vlingen bel\u00f6nar innovation och kunnande i infrastrukturprojekt och det \u00e4r v\u00e5rt arbete med det som kallas BIM och 3D-modellering som bel\u00f6nats.<\/span><\/address>\n<p><span style=\"font-size: 14px;\">&#8211;&nbsp;Det h\u00e4r \u00e4r v\u00e4ldigt hedrande, s\u00e4ger Martin Hellgren, projektchef f\u00f6r utbyggnaden till Nacka och s\u00f6derort. Vi ska bygga en modern tunnelbana i en komplicerad milj\u00f6 och f\u00f6r att lyckas beskriva hur det ska g\u00f6ras beh\u00f6ver vi anv\u00e4nda teknik som ligger i framkant. Det k\u00e4nns verkligen motiverande att det arbete vi g\u00f6r tillsammans med v\u00e5ra konsulter SWECO och Typsa redan nu uppm\u00e4rksammats och prisbel\u00f6nats.<\/span><\/p>\n<p><span style=\"font-size: 16px;\"><strong>B\u00e4ttre f\u00f6rst\u00e5else med 3D<\/strong><\/span><\/p>\n<p><span style=\"font-size: 14px;\">Bim betyder Building Information Modeling och \u00e4r ett s\u00e4tt att se allt man planerar att bygga i 3D. Det \u00e4r en relativt ny metod, som underl\u00e4ttar arbetet. F\u00f6rdelen \u00e4r att det ger en b\u00e4ttre f\u00f6rst\u00e5else f\u00f6r b\u00e5de helheten och sammanhangen, man kan vrida och v\u00e4nda p\u00e5 det man granska.&nbsp;<\/span><\/p>\n<p><span style=\"font-size: 14px;\">I modellen \u00e4r det ocks\u00e5 m\u00f6jligt att g\u00e5 in i enskilda rum och titta runt hur det kommer att se ut n\u00e4r alla installationer \u00e4r p\u00e5 plats. Det g\u00f6r att man kan uppt\u00e4cka konflikter som skulle vara sv\u00e5ra att se p\u00e5 en vanlig pappersritning.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Det blev ett andrapris i kategorin \u201dInnovation in Rail and Transit\u201d i 2016 \u00e5rs Be Inspired Awards. T\u00e4vlingen bel\u00f6nar innovation och kunnande i infrastrukturprojekt och det \u00e4r v\u00e5rt arbete med det som kallas BIM och 3D-modellering som bel\u00f6nats. &#8211;&nbsp;Det h\u00e4r \u00e4r v\u00e4ldigt hedrande, s\u00e4ger Martin Hellgren, projektchef f\u00f6r utbyggnaden till Nacka och s\u00f6derort. Vi ska [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":7402,"comment_status":"closed","ping_status":"open","sticky":false,"template":"templates\/template-press-news.php","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-187","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/comments?post=187"}],"version-history":[{"count":1,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/187\/revisions"}],"predecessor-version":[{"id":13265,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/187\/revisions\/13265"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media\/7402"}],"wp:attachment":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media?parent=187"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/categories?post=187"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/tags?post=187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}