{"id":21528,"date":"2023-06-20T09:45:36","date_gmt":"2023-06-20T07:45:36","guid":{"rendered":"https:\/\/nyatunnelbanan.se\/?p=21528"},"modified":"2024-01-12T12:54:23","modified_gmt":"2024-01-12T11:54:23","slug":"see-the-stations-of-the-future-today","status":"publish","type":"post","link":"https:\/\/nyatunnelbanan.se\/en\/news\/see-the-stations-of-the-future-today\/","title":{"rendered":"See the stations of the future today"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Come 2030, you can be 100 metres below ground at Sofia station, on your way from the lift from Stigbergsparken towards the platform and the metro services heading south. On this particular day, perhaps you have plenty of time, so you take a good look around. Perhaps you think, \u201cWhat a great combination, that turquoise wall and gold-coloured letters,\u201d while also wondering who came up with the idea.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe artists have been involved in the process since back in 2015. They\u2019ve worked closely with the architects and engineers to ensure that the artwork is an integral part of every station. The artwork in Stockholm\u2019s metro system is important, and we\u2019re proud to be continuing that tradition with the world\u2019s longest art exhibition,\u201d says Martin Hellgren, who is responsible for all the stations being built when extending the Blue Line south from Kungstr\u00e4dg\u00e5rden.&nbsp;&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Realistic for travellers<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">However, the new images do not simply show the artwork. They have been produced from the computer model used as the blueprint for the entire new metro system. They show the scenes as seen from eye level, and the colours and textures have been processed and reviewed by the artists.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe use angles that are relevant and that provide future travellers with as realistic an image as possible. We also want to show things that we\u2019re asked about, such as how the lifts at Gullmarsplan and Sofia will work,\u201d says Martin.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Now, you\u2019re sitting on a train heading south, that same afternoon in 2030. At Gullmarsplan, you lift your eyes from your screen \u2013 you\u2019re soon at your destination \u2013 and see just how beautiful the station looks. \u201cI wonder what that\u2019s supposed to represent,\u201d you think, but there\u2019s no time to find out, it\u2019s your stop, Slakthusomr\u00e5det. Perhaps you look down now, remembering an article you read a long time ago. \u201cThe floor really does look like ice that someone\u2019s skated across. I wonder who came up with that idea?\u201d&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here, you can see all the new images and find out the names of both the artists and the artworks.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sofia<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Artists:<\/strong>&nbsp;Peter Johansson and Barbro Westling<br><strong>Name of the artwork:<\/strong>&nbsp;\u201cFlux\u201d<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_mellanplan-1024x683.jpg\" alt=\"Station Sofia, mellanplan\" class=\"wp-image-21347\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_mellanplan-1024x683.jpg 1024w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_mellanplan-300x200.jpg 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_mellanplan-768x512.jpg 768w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_mellanplan-1536x1024.jpg 1536w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_mellanplan-1200x800.jpg 1200w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_mellanplan-1980x1320.jpg 1980w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_mellanplan.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Sofia, mezzanine floor<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_biljetthall-1024x683.jpg\" alt=\"Station Sofia, biljetthall\" class=\"wp-image-21349\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_biljetthall-1024x683.jpg 1024w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_biljetthall-300x200.jpg 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_biljetthall-768x512.jpg 768w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_biljetthall-1536x1024.jpg 1536w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_biljetthall-1200x800.jpg 1200w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_biljetthall-1980x1320.jpg 1980w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_biljetthall.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_biljetthall_004-scaled.jpg\"><\/a>Sofia, ticket hall and entrance.<a href=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_plattform_005-scaled.jpg\"><\/a><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_plattformsrum-1024x683.jpg\" alt=\"Station Sofia, plattform\" class=\"wp-image-21351\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_plattformsrum-1024x683.jpg 1024w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_plattformsrum-300x200.jpg 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_plattformsrum-768x512.jpg 768w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_plattformsrum-1536x1024.jpg 1536w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_plattformsrum-1200x800.jpg 1200w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_plattformsrum-1980x1320.jpg 1980w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_plattformsrum.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Sofia, mezzanine floor<a href=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_biljetthall_004-scaled.jpg\"><\/a>Sofia, ticket hall and entrance.<a href=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Sofia_plattform_005-scaled.jpg\"><\/a>Sofia \u2013 the second deepest platform in the world.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Sickla<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Artist:<\/strong>&nbsp;Anna Lerinder&nbsp;<br><strong>Name of artwork:<\/strong>&nbsp;\u201cUtblick och riktning\u201d (\u201c<em>View and Direction<\/em>\u201d)\u202f&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SIK_vy-entrehall-1024x683.jpg\" alt=\"\" class=\"wp-image-21275\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SIK_vy-entrehall-1024x683.jpg 1024w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SIK_vy-entrehall-300x200.jpg 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SIK_vy-entrehall-768x512.jpg 768w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SIK_vy-entrehall-1536x1024.jpg 1536w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SIK_vy-entrehall-2048x1366.jpg 2048w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SIK_vy-entrehall-1200x800.jpg 1200w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SIK_vy-entrehall-1980x1320.jpg 1980w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Sickla \u2013 ticket hall, Sickla station house.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">J\u00e4rla<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Artist:<\/strong>&nbsp;Cilla Ramnek&nbsp;<br><strong>Name of artwork:<\/strong>&nbsp;\u201cDirection Home\u201d\u202f&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/JAL-vy-plattform-1024x683.jpg\" alt=\"\" class=\"wp-image-21282\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/JAL-vy-plattform-1024x683.jpg 1024w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/JAL-vy-plattform-300x200.jpg 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/JAL-vy-plattform-768x512.jpg 768w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/JAL-vy-plattform-1536x1024.jpg 1536w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/JAL-vy-plattform-2048x1365.jpg 2048w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/JAL-vy-plattform-1200x800.jpg 1200w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/JAL-vy-plattform-1980x1320.jpg 1980w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">J\u00e4rla platform.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Nacka<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Artist:<\/strong>&nbsp;Thomas Karlsson&nbsp;<br><strong>Name of artwork:<\/strong>&nbsp;\u201cElefanten och Nosh\u00f6rningen\u201d (\u201c<em>The Elephant and the Rhinoceros<\/em>\u201d)<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-norra-biljetthallen-1024x768.jpg\" alt=\"\" class=\"wp-image-21278\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-norra-biljetthallen-1024x768.jpg 1024w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-norra-biljetthallen-300x225.jpg 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-norra-biljetthallen-768x576.jpg 768w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-norra-biljetthallen-1536x1152.jpg 1536w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-norra-biljetthallen-2048x1536.jpg 2048w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-norra-biljetthallen-600x450.jpg 600w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-norra-biljetthallen-1200x900.jpg 1200w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-norra-biljetthallen-1980x1485.jpg 1980w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Nacka \u2013 ticket hall at the corner of Skvaltans v\u00e4g and Vikdalsbron.<a href=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-Sodra-biljetthallen-scaled.jpg\"><\/a><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-Sodra-biljetthallen-1024x768.jpg\" alt=\"\" class=\"wp-image-21280\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-Sodra-biljetthallen-1024x768.jpg 1024w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-Sodra-biljetthallen-300x225.jpg 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-Sodra-biljetthallen-768x576.jpg 768w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-Sodra-biljetthallen-1536x1152.jpg 1536w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-Sodra-biljetthallen-2048x1536.jpg 2048w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-Sodra-biljetthallen-600x450.jpg 600w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-Sodra-biljetthallen-1200x900.jpg 1200w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-Sodra-biljetthallen-1980x1485.jpg 1980w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Nacka \u2013 ticket hall at the corner of Skvaltans v\u00e4g and Vikdalsbron.<a href=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/NAC-Sodra-biljetthallen-scaled.jpg\"><\/a>Nacka \u2013 ticket hall in Jarlaberg.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Gullmarsplan<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Artist:<\/strong>&nbsp;Jesper Nyr\u00e9n&nbsp;<br><strong>Name of artwork:<\/strong>&nbsp;\u201cWindows\u201d<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_mellanplan_008-1024x683.jpg\" alt=\"\" class=\"wp-image-21299\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_mellanplan_008-1024x683.jpg 1024w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_mellanplan_008-300x200.jpg 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_mellanplan_008-768x512.jpg 768w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_mellanplan_008-1536x1024.jpg 1536w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_mellanplan_008-2048x1365.jpg 2048w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_mellanplan_008-1200x800.jpg 1200w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_mellanplan_008-1980x1320.jpg 1980w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Gullmarsplan \u2013mezzanine floor from which you take the escalator down to the platform.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_utrymningsplats_007-1024x683.jpg\" alt=\"\" class=\"wp-image-21302\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_utrymningsplats_007-1024x683.jpg 1024w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_utrymningsplats_007-300x200.jpg 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_utrymningsplats_007-768x512.jpg 768w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_utrymningsplats_007-1536x1024.jpg 1536w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_utrymningsplats_007-2048x1365.jpg 2048w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_utrymningsplats_007-1200x800.jpg 1200w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/Gullmarsplan_utrymningsplats_007-1980x1320.jpg 1980w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Gullmarsplan \u2013 way up at M\u00e5rtensdal.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Slakthusomr\u00e5det<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Artist:<\/strong>&nbsp;Helena Isoz&nbsp;<br><strong>Name of artwork:<\/strong>&nbsp;\u201c\u00c5kning\u201d (\u201c<em>Trip<\/em>\u201d)\u202f&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SLO_vy-plattform-1024x683.jpg\" alt=\"\" class=\"wp-image-21305\" srcset=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SLO_vy-plattform-1024x683.jpg 1024w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SLO_vy-plattform-300x200.jpg 300w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SLO_vy-plattform-768x512.jpg 768w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SLO_vy-plattform-1536x1024.jpg 1536w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SLO_vy-plattform-2048x1365.jpg 2048w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SLO_vy-plattform-1200x800.jpg 1200w, https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2023\/06\/SLO_vy-plattform-1980x1320.jpg 1980w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Slakthusomr\u00e5det, the platform.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>For the first time, we now have images showing what the interior of Sofia station will look like, as well as the new areas at Gullmarsplan, the ticket halls in Nacka and the platforms at Slakthusomr\u00e5det station and J\u00e4rla station.<\/p>\n","protected":false},"author":3,"featured_media":21330,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"templates\/template-press-news.php","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[87,161],"tags":[],"class_list":["post-21528","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-procurement"],"acf":[],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/21528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/comments?post=21528"}],"version-history":[{"count":2,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/21528\/revisions"}],"predecessor-version":[{"id":21530,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/21528\/revisions\/21530"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media\/21330"}],"wp:attachment":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media?parent=21528"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/categories?post=21528"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/tags?post=21528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}