{"id":248,"date":"2017-02-15T13:35:36","date_gmt":"2017-02-15T13:35:36","guid":{"rendered":"https:\/\/nyatunnelbanan.se\/2017\/02\/15\/we-will-begin-move-pipes-and-conduits-during-year\/"},"modified":"2021-12-03T14:19:52","modified_gmt":"2021-12-03T14:19:52","slug":"we-will-begin-move-pipes-and-conduits-during-year","status":"publish","type":"post","link":"https:\/\/nyatunnelbanan.se\/en\/news\/we-will-begin-move-pipes-and-conduits-during-year\/","title":{"rendered":"We will begin to move pipes and conduits during this year"},"content":{"rendered":"<address><span style=\"font-size: 18px;\">At the mouths of the work tunnels we need to move pipes and conduits that are in the way of construction and excavations. Electricity, optoelectronic, and telecom cables and district heating, district cooling, water, gas, sewage and rainwater pipes all need to be moved.&nbsp;<\/span><\/address>\n<p><span style=\"font-size: 14px;\">Pipes and cables are often laid in municipal ground, most frequently below roads and streets but also below lawns and other open spaces.&nbsp;<\/span><\/p>\n<p><span style=\"font-size: 14px;\">During 2017 we will begin the work of relocating the pipes and cables at the mouths of the work tunnels at the London viaduct north of Sockenplan, J\u00e4rla, Blasieholmen and Skvaltan alongside the V\u00e4rmd\u00f6leden freeway.<\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>At the mouths of the work tunnels we need to move pipes and conduits that are in the way of construction and excavations. Electricity, optoelectronic, and telecom cables and district heating, district cooling, water, gas, sewage and rainwater pipes all need to be moved.&nbsp; Pipes and cables are often laid in municipal ground, most frequently [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":7234,"comment_status":"closed","ping_status":"open","sticky":false,"template":"templates\/template-press-news.php","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-248","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/comments?post=248"}],"version-history":[{"count":1,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/248\/revisions"}],"predecessor-version":[{"id":13262,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/248\/revisions\/13262"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media\/7234"}],"wp:attachment":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media?parent=248"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/categories?post=248"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/tags?post=248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}