{"id":5039,"date":"2018-08-30T08:30:00","date_gmt":"2018-08-30T08:30:00","guid":{"rendered":"https:\/\/nyatunnelbanan.se\/2018\/08\/30\/international-award-architecture-given-yellow-line\/"},"modified":"2021-12-03T14:20:19","modified_gmt":"2021-12-03T14:20:19","slug":"international-award-architecture-given-yellow-line","status":"publish","type":"post","link":"https:\/\/nyatunnelbanan.se\/en\/news\/international-award-architecture-given-yellow-line\/","title":{"rendered":"International Award for Architecture given to the Yellow Line"},"content":{"rendered":"<address>A total of 748 projects from fifty different countries competed in the Global Architecture &amp; Design Awards 2018, and the winning entry in the Transportation category was the design concept for the Yellow Line.<\/address>\n<p><span style=\"font-size: 14px;\">Staffan Nordlund, architect and lead project coordinator for the Yellow Line to Arenastaden, joined forces with the architectural firm &amp;Rundqvist in developing the Yellow Line stations.<\/span><\/p>\n<p><span style=\"font-size: 14px;\">\u201dOur aim has been to establish a good collaboration between architect and artist from an early stage. This award is proof that we have truly succeeded,\u201d he says.<\/span><\/p>\n<p><span style=\"font-size: 14px;\">The organisation behind the international award is Rethinking the Future, whose work includes showcasing architecture and design that helps protect our climate.<\/span><\/p>\n<p><span style=\"font-size: 14px;\"><a title=\"Architectural award\" href=\"https:\/\/www.re-thinkingthefuture.com\/gada-2018-winners\/the-yellow-line-rundquist\/\" target=\"_blank\" rel=\"noopener\">Further information on the Award.<\/a><\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-489\" src=\"https:\/\/nyatunnelbanan.se\/wp-content\/uploads\/2018\/08\/Plattform-Hagalund-scaled.jpg\" alt=\"\" width=\"5025\" height=\"3350\" style=\"width: 300px; height: 200px;\" \/><br \/><span style=\"font-size: 14px;\"><strong>The platform at S\u00f6dra Hagalund. Top: the platform at Hagastaden.<\/strong><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A total of 748 projects from fifty different countries competed in the Global Architecture &amp; Design Awards 2018, and the winning entry in the Transportation category was the design concept for the Yellow Line. Staffan Nordlund, architect and lead project coordinator for the Yellow Line to Arenastaden, joined forces with the architectural firm &amp;Rundqvist in [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":6992,"comment_status":"closed","ping_status":"open","sticky":false,"template":"templates\/template-press-news.php","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-5039","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/5039","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/comments?post=5039"}],"version-history":[{"count":1,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/5039\/revisions"}],"predecessor-version":[{"id":13284,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/5039\/revisions\/13284"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media\/6992"}],"wp:attachment":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media?parent=5039"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/categories?post=5039"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/tags?post=5039"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}