{"id":619,"date":"2019-03-18T09:00:23","date_gmt":"2019-03-18T09:00:23","guid":{"rendered":"https:\/\/nyatunnelbanan.se\/2019\/03\/18\/bang-start-new-metro\/"},"modified":"2021-12-03T14:20:15","modified_gmt":"2021-12-03T14:20:15","slug":"bang-start-new-metro","status":"publish","type":"post","link":"https:\/\/nyatunnelbanan.se\/en\/news\/bang-start-new-metro\/","title":{"rendered":"Loud start for the new Metro"},"content":{"rendered":"<address><span style=\"font-size:18px;\">Around 80 guests, seven speeches and one big bang. On Monday&nbsp; March 4th, the historic expansion of the Metro was initiated.<\/span><\/address>\n<p><span style=\"font-size:14px;\">Published: 2019-03-18<\/p>\n<p>Construction began with a ceremonial starting blast in a rock cavern in Barkarby, which brought together all the parties who are involved in paying for the new Metro.<\/span><\/p>\n<p><span style=\"font-size:14px;\">The rock cavern is a legacy from the time when the location was a military airfield. The first new Metro tunnels will be built from there, and soon we will see huge trucks driving around &#8211; filled with the stone that has been blasted out.<\/p>\n<p><span style=\"font-size:16px;\"><strong>A long-awaited day<\/strong><\/span><br \/>\u201cWe\u2019re finally beginning construction! This is the day that I and all my colleagues have worked so hard for and longed for, for several years,\u201d says Anna Nyl\u00e9n.<\/p>\n<p>She is project manager for the Blue Line to Barkarby, which is the first part of the new Metro to be built, although today&#8217;s starting blast is for the whole construction:<\/p>\n<p>\u201cWe are now starting the largest expansion in Stockholm public transport since the Blue Line was built in the 70s! &#8220;It really feels like a historic day,&#8221; says administration director for the new subway M\u00e5rten Frumerie.<\/span><\/p>\n<p><span style=\"font-size:14px;\"><span style=\"font-size:16px;\"><strong>A new Yellow Line<\/strong><\/span><br \/>The metro\u2019s Blue Line is to be extended from Akalla to Barkaby, and from Kungstr\u00e4dg\u00e5rden to Nacka and the southern suburbs. A brand new Yellow Line will be built from Odenplan to Arenastaden and eventually a new line will also be built from Fridhemsplan to \u00c4lvsj\u00f6.<\/span><br \/>&nbsp;<\/p>\n<p><span style=\"font-size:14px;\"><strong><span style=\"font-size:16px;\">Speakers in the picture:<\/span><\/strong><br \/>Kristoffer Tamsons (M), <em>Traffic Region Council<\/em><br \/>Irene Svenonius (M), <em>Financial Region Council<\/em><br \/>Anna K\u00f6nig J\u00e4rlmyr (M), <em>Municipal Chairman of the City of Stockholm<\/em><br \/>Mats Gerdau (M), <em>Municipal Chairman of Nacka Municipality<\/em><br \/>Pehr Granfalk (M), <em>Municipal Chairman of the City of Solna<\/em><br \/>Emma Feldman (M), <em>Municipal Chairman of J\u00e4rf\u00e4lla Municipality<\/em><br \/>Helena Sundberg, <em>Stockholm Regional Manager, Swedish Transport Administration<\/em><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Around 80 guests, seven speeches and one big bang. On Monday&nbsp; March 4th, the historic expansion of the Metro was initiated. Published: 2019-03-18 Construction began with a ceremonial starting blast in a rock cavern in Barkarby, which brought together all the parties who are involved in paying for the new Metro. The rock cavern is [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":6829,"comment_status":"closed","ping_status":"open","sticky":false,"template":"templates\/template-press-news.php","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-619","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/619","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/comments?post=619"}],"version-history":[{"count":1,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/619\/revisions"}],"predecessor-version":[{"id":13276,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/posts\/619\/revisions\/13276"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media\/6829"}],"wp:attachment":[{"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/media?parent=619"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/categories?post=619"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nyatunnelbanan.se\/en\/wp-json\/wp\/v2\/tags?post=619"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}