Thousands of people work with the Stockholm metro expansion. The collective experience and expertise are immense. With a health and safety award, we want to highlight initiatives that have contributed to increased safety at our construction site.
Every improvement counts
The comptetition entry can be an engaged team, a working method, or a smart solution. It can be something small or something big — every improvement matters.
We are currently evaluating competition entries. The winner will be announced in September 2026.
How do you participate?
The competition is closed. The last day to enter submissions was June 5th.
What should the competition entry include?
Nominate an engaged team, a working method, or a smart solution that has contributed to increased safety in the workplace. Provide a short written description including:
- Which challenges or problems were solved
- How the entry has improved safety in the workplace
- How the entry can inspire or be used by others
- How the work has been characterized by collaboration and transparency
Feel free to include images, drawings, illustrations, or anything else that helps describe the competition entry.
How is the winner selected?
The winner is selected by a jury from the Administration for the Extended Metro and will be presented in connection with Håll Nollan’s Safety Push on September 15.
What is the prize?
30,000 SEK

