Orientation
At Liljeholmen, a new platform for the Yellow Line will be constructed beneath the existing metro station. A work tunnel is being built from Södertäljevägen down to the new station. During the construction phase, the tunnel will be used to haul out rock spoil as the new station is built. During the operational phase, the tunnel will be used as a service tunnel for maintenance and as an emergency evacuation route.
About the Contract
The assignment comprises the execution of:
- Rock engineering for the technical tunnel, station, and track tunnels.
- Ground/earthworks, water and sewage (W&S), and concrete structures.
Model images
Orange: Scope.
Yellow: Option.
Facts
Form of Contract (Procurement)
General contract (Main contract / General construction contract).
Form of Contract (Execution)
Construction contract (AB 04 – General Conditions of Contract for Building, Civil Engineering and Installation Works), though with design responsibility (functional responsibility) for certain parts.
Form of Compensation
Fixed price with quantity regulation and index regulation.
Security Assessment
Security-classified documents in the procurement are not applicable.
Evaluation Model
The most economically advantageous tender with regard to the best price-quality ratio (lowest comparison sum).
Schedules
For current schedules, please refer to the procurement schedule.