Orientation
At Liljeholmen, a new platform for the Yellow line is being constructed beneath the existing metro station. Passengers will be transported by 6 elevators between the ticket hall, adjacent to the existing facility, and the new platform.
About the Contract
The assignment includes:
- Design and execution of: Permanent geotechnical retaining structure with GK3 classification (Geotechnical category 3) regarding secant pile construction, with associated concrete structure.
- Execution of concrete structure with associated steel piles.
Model images
Green: Secant piles (design and construction)
Purple: Concrete (design and construction)
Yellow: Concrete (construction)
Facts
Procurement procedure:
Negotiated procedure with prior call for competition pursuant to Chapter 6, Section 4 of the Swedish Utilities Procurement Act (LUF).
Form of contract:
Design-build contract (Turnkey contract)
Form of compensation:
Fixed price
Security assessment:
Not applicable
Evaluation model:
The most economically advantageous tender based on the best price-quality ratio
Timelines: